Little info on the current server:
Dell PowerEdge 1900
Intel Xeon Quad Core Processor SLAEJ E5345 2.33.0 Ghz 8m Cache X2 (so total 8 of cores @2.33 GHz)
16 GB of PC2-5300F ECC (maxed out, mobo will not take anymore)
6 WD Black 1TB HDDs. Raid 1+0 with 5th drive being a failsafe for the other 4 and 6th HDD is a stand alone and is used as second backup location for the AC database backup. So 2TB is my OS and AC drive. I know this is very redundant, but data loss is not an option or a risk I'm willing to take.
OS is Server 08 R2 Standard SP1.

As for LAN, everything is hardwired in @ 1 Gbps.

New server will be ordered whenever new Server OS comes out with the OS. Which, hopefully, will be in the next 2 years from what i have seen of Microsoft. The PowerEdge will get reconfigured for something else, will cross that bridge when we will get to it.
As for a new server, i was thinking something along the lines of 16+TB of HDD space, 96-128 GB RAM, and whatever will be a decent CPU at the time. Also SSDs should drop even more in price and increase in size. But time will show. And Yes, $5000 to $7000 on a up to date server is to be expected. Also, a decent local server will always be faster compared to a cloud server. So i don't consider that as an option.

Placing everyone on a domain is part of the planned things for this trip. This wasn't needed before. I made the AC folder shared and password protected. So in case of loss of path or addition of a new terminal, path on a the terminal was specified and problem solved.

Also, the reason why i'm here asking these questions is because i'm trying to learn and become more self sufficient.



Yuriy Kovalov
Medicus Family Practice/Express Care
Mechanical Engineering student
Reno NV,
Sometimes Albuquerque, NM